General contractors stand on both sides of the tender.

As a general contractor (GU) or design-and-build contractor (TU), you obtain quotes from the trade contractors before you award the work. Scait splits the specification, which is structured by trade, into packages. Management sees the contract type and the dates, and cost planning checks ready-made packages instead of empty folders.

Many general contractors also work as building or civil engineering contractors in their own right. For those tenders, choose building construction or civil engineering above.

Housing development at shell stage seen from above, with crane

The documents arrive neither organised by element nor split into packages.

  • Often there is no bill of quantities, and the requirements are scattered across the specification.

  • The specification is structured by trade, your cost plan by element.

  • For each trade, you pick its part out of the specification.

SpecificationPDF · 186 pagesIm Lee development, structured by trade
Scait
Contract typeLump sum, payments in instalmentsConstruction contract
DatesPhase 1 occupation at the end of JuneSpecial conditions
PackagesTrade packagesSpecification, selected sections

Scait summarises contract type and payments for GU and TU.

  1. Contract type, payments, dates The summary for GU and TU sets out what the documents say about contract type and payments, about in-house work and subcontracting, and about the areas and volumes of the building, plus dates and documents to submit.
Sonnenhalde residential development
  1. Main groups and trades The requirements for the works are shown by main group of the elemental breakdown, and the packages by trade. Allocation down to the individual element remains with your cost planners.
Sonnenhalde residential development

Scait builds the packages. Your team has the final say.

For each trade, a package is created with the general documents and the relevant extract from the specification. Your team adds what is missing and removes what is surplus.


As a design-and-build contractor, you take on the design too.

In a design-and-build competition, the design counts alongside the price, and the design team works on the submission. With guest access, it sees the documents in Scait and can comment.

Scait shows you the summary and the packages.

Ideally, management and cost planning attend the meeting together.

Book a meeting

Frequently asked questions

We work with bespoke contracts, and there is no standard form. Is a summary any use then?

Yes. If a contract is enclosed, contract type and payments appear in the summary, with source references.

We estimate in our own program. So why a platform?

Scait supports the work before estimating, from the tender to the packages for the trade contractors. The estimate stays in your program.

Does the platform also send the packages to our trade contractors?

No. You download the packages or give the trade contractors a download link. You send the enquiry itself as before.