Are the quantities plausible? Know what you are pricing.

A bill of quantities has hundreds of items. Sometimes a quantity does not add up, sometimes a contract term is hidden in an item. Scait sets the quantities against each other and flags what stands out, before submission.


Your price rests on hundreds of items, read under time pressure.

  • Removal from site is in the tender, but the item for landfill charges is missing.

  • This time an ordinary item carries a contractual penalty.

  • The bill of quantities does not show whether concrete and reinforcement match.

Bill of quantitiesFile in Swiss standard format · 1.8 MBVillage main road renewal
Scait
CriticalContractual penalty in an itemBill of quantities
HighLandfill charges missingEarthworks balance
MediumReinforcement content above the rangeReinforcement-to-concrete ratio

Quantities from the bill of quantities, set against each other.

  1. Principal quantities at a glance Scait extracts the principal quantities of the works from the bill of quantities.
Village main road renewal
  1. Earthworks balance with cross-check Scait sets excavation and imported material against fill and removal from site and shows whether the balance adds up.
Village main road renewal
  1. And further plausibility checks For example, Scait shows the reinforcement content per cubic metre of concrete, with the expected range alongside.
Village main road renewal

A rule set with checks for selected trades.

For concrete, surfacing or drainage, for example, a dedicated rule set checks the bill of quantities. Each check shows a traffic light, and one sentence tells you whether you need to ask before submission.


What is hidden in an item but does not belong there?

In the measured items, Scait flags contract terms, such as a contractual penalty.

“
Scait is like a sparring partner that helps to uncover blind spots.
Estimator, civil engineering contractor

See what Scait finds in a tender’s bill of quantities.

After the meeting, you can test Scait on the bill of quantities of one of your own tenders.

Book a meeting

Frequently asked questions

Can I rely on the quantities, or do I have to recalculate everything?

Not without your own check. Scait flags what stands out and shows key figures. We work with several freelance estimators on this. Interpreting the figures is still up to you: you check the passage in the bill of quantities and confirm or clarify it.

What format does the bill of quantities need to be in?

A file in the Swiss standard format. From it, Scait reads the quantities for the earthworks balance. Whether a free-text bill of quantities or a performance-based tender gives Scait enough to work with is something we can clarify in the meeting.

Our estimator knows the quantities from experience. So what does the check add?

Experience remains the benchmark. Scait takes you to the flagged items, with the source reference alongside. You confirm what you already know and verify what is new.