In building construction, it is often not price alone that counts.
The award is often decided on points for price and quality, and the supporting documents count too. Scait processes your construction tender and shows award criteria, conditions and required documents with their source references. That way, management and estimating know what matters.The benefit grows with the package, not with company size.
If you also bid in civil engineering, ground conditions and waste classification come into play there. See the page for civil engineering.



The contractor wirbauen AG, which focuses on building construction, works with Scait.
More on the Swiss Contractors’ AssociationWhat the client evaluates is scattered across the package.
How much the price counts differs from tender to tender.
The required supporting documents are scattered, and the list of them is compiled by hand.
Every enquiry to subcontractors and suppliers is put together by hand.

You know what counts before your price is fixed.
- Award criteria with evaluation matrix Scait reads the conditions of tender and shows how much weight price and quality carry in the award.
- Price50%
- Project analysis20%
- Key personnel15%
- References15%
- Supporting documents on one list Each criterion calls for supporting documents, from proof of eligibility to reference projects. Scait collects them on one list and suggests references and key personnel from your library.
- Commercial register extractoutstanding
- Reference project, schoolsuggestion
- Reference sheet, project managersuggestion
- Project analysisoutstanding
- Subcontractor enquiries In building construction, more of the work is often subcontracted than in civil engineering. Scait allocates the items of the bill of quantities; you choose the companies, check each enquiry and send it from the project.
- Concrete and masonryin-house
- Scaffoldingenquiry
- Ready-mixed concretematerials
- Alu-clad timber windowsenquiry
Alterations and refurbishment. You clear up discrepancies before submission.
On work to existing buildings, the documents contradict each other in places. Scait puts conflicting statements from two documents side by side, records your clarifications in one place and reads the contract and conditions as it does for a new build.
Windows in the existing building are retained and refurbished.
Remove and dispose of windows in existing building.
- Question to the clientAre the existing windows to be retained or replaced?
Next in the bid process.
See what counts besides the price in a building tender.
We demonstrate this on a sample tender, and afterwards you can try it on one of your own.
Book a meetingFrequently asked questions
We build mainly for private clients, often small contracts. Is it worthwhile for us?
For small contracts with a few pages of conditions, price is usually decisive, and then it tends not to be worthwhile, whether private or public. In a meeting we work out where the threshold lies for you.
In building construction, not all concrete is the same. Does the quantity check still work?
In part. Which concrete belongs in which element is for your estimators to judge. Scait extracts the principal quantities from the bill of quantities and flags what stands out.
We bid mainly to general contractors. Does this apply to their tenders too?
Yes. Whether the tender comes from the public sector or from a general contractor, the contract, conditions and bill of quantities go through the same process.