Your items are often specific to your trade, but the contract conditions are general.

Along with your items you receive the construction contract and the general conditions of contract, and both contain obligations for your trade. For every finding in the contract, Scait names the commercial consequence. That way, you can settle outstanding points with your client before you commit.

If your business also carries out concrete, masonry or civil works, the pages for building construction and civil engineering are the right ones.

Electrician testing the terminals in a control cabinet with a meter

For these trades.

  • Electrical
  • Building services
  • Painting and plastering
  • Flooring and tiling
  • Windows and facades
  • Metalwork
  • Timber construction
  • Metal roofing and flashings
  • Drylining
  • Other tradesTalk to us

Your obligations go beyond your items.

  • Deadlines and contractual penalties are in the contract, not in your items.

  • Some appendices require specific evidence from your trade.

  • Some bills of quantities are not structured to the Swiss standard.

ItemsExtract from the bill of quantities
Construction contractPDF · 24 pages
General conditions of contractPDF · 12 pages
Scait
DeadlineContractual penalty per calendar day of delayConstruction contract
DefectsFive-year defects liability period, extended liabilityContract conditions
EvidenceTest report before commissioningAppendix to the construction contract

Scait also takes into account what lies outside your items.

  1. Review rules for every enquiry Scait checks every enquiry against your company’s risk profile and review rules. We set up both with you during onboarding. That way, you see early on whether to quote.
Electrical installations enquiry
  1. Dates with a contractual penalty Scait’s list of key dates shows them.
Electrical installations enquiry
  1. Questions about the appendices Ask Scait about the evidence an appendix requires or about the requirements of a free-text bill of quantities. The answer takes you to the passage in the document.
Electrical installations enquiry

When your client prepares their enquiry with Scait.

The enquiry arrives in your inbox: from the building contractor with your items, from the general contractor as a package for your trade. Or they invite you into their project as a guest. You do not need a Scait account.

More on collaboration

A meeting shows what Scait does for your trade.

Invite whoever prepares quotes at your company and whoever approves them.

Book a meeting

Frequently asked questions

Does this also suit a painting and plastering business?

Yes. Scait checks construction contracts for painting and plastering works like any other construction contract.

So far we have managed without. What does it give us?

Every enquiry goes through the same company review rules, no matter who in the team prepares the quote.