Your items are often specific to your trade, but the contract conditions are general.
Along with your items you receive the construction contract and the general conditions of contract, and both contain obligations for your trade. For every finding in the contract, Scait names the commercial consequence. That way, you can settle outstanding points with your client before you commit.
If your business also carries out concrete, masonry or civil works, the pages for building construction and civil engineering are the right ones.

For these trades.
- Electrical
- Building services
- Painting and plastering
- Flooring and tiling
- Windows and facades
- Metalwork
- Timber construction
- Metal roofing and flashings
- Drylining
- Other tradesTalk to us
Your obligations go beyond your items.
Deadlines and contractual penalties are in the contract, not in your items.
Some appendices require specific evidence from your trade.
Some bills of quantities are not structured to the Swiss standard.

Scait also takes into account what lies outside your items.
- Review rules for every enquiry Scait checks every enquiry against your company’s risk profile and review rules. We set up both with you during onboarding. That way, you see early on whether to quote.
- Uncapped contractual penaltytriggered
- Your company’s other rulesnot triggered
- Dates with a contractual penalty Scait’s list of key dates shows them.
- MarchStart of first fix
- MayFirst fix completePenalty
- AugustCommissioningPenalty
- SeptemberAcceptance
- Questions about the appendices Ask Scait about the evidence an appendix requires or about the requirements of a free-text bill of quantities. The answer takes you to the passage in the document.
What evidence does Appendix 4 require from us?
What does the bill of quantities require for emergency lighting?
When your client prepares their enquiry with Scait.
The enquiry arrives in your inbox: from the building contractor with your items, from the general contractor as a package for your trade. Or they invite you into their project as a guest. You do not need a Scait account.
More on collaborationA meeting shows what Scait does for your trade.
Invite whoever prepares quotes at your company and whoever approves them.
Book a meetingFrequently asked questions
Does this also suit a painting and plastering business?
Yes. Scait checks construction contracts for painting and plastering works like any other construction contract.
So far we have managed without. What does it give us?
Every enquiry goes through the same company review rules, no matter who in the team prepares the quote.